EVOK has its own secure room (dedicated and physically delimited area) in a datacenter in the Friborg region. This datacenter is TIER III certified.
The site environment presents a particularly low risk profile, whether civil, natural, industrial, transport or electromagnetic risks. The presence of a nearby hydroelectric dam secures the energy supply of 100% green electricity and ISO 14064 certified.
As soon as the outside temperature is below 15 ° C, the Data Center is exclusively cooled by outside air (Free Cooling). This technology, also described as passive cooling, results in significant energy savings. In addition, these infrastructures make it possible to heat and supply the production of hot water to nearby commercial buildings by using the heat released by the installations and thus save up to 100,000 liters of fuel oil per year.
EVOK is 100% owner of its server infrastructure and network equipment and has multiple BGP feeds (internet links for global operators)
We have fiber links directly in our racks with the two main Swiss communication players for “Company” type links (Swisscom and UPC)